Friday, July 30, 2010
Fratelli log July 28, 2010
Purchased lumber and pry bars needed to move generator
Finished diconnecting generator fuel lines, hoses and electrical. Bolts holding down generator had to be cut or drilled out. The original design set the generator in place then finished building around it. Recommend that the new frame work be more modular in design allowing the generator to be easily removed and accessed for major overhaul and repair. Also, moving the generator forward 6-10 inches would allow better access all around.
Lifted generator base with pry bars and rolled the generator over using socket tools as rollers and a chain come-a-long
.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment