Friday, July 30, 2010

July 28 continued














Needed to purchase a circular saw in order to cut bottom decking at a set depth.

Aft deck canvas cover sides were removed for alterations. The stair cover was also removed. it will have a zipper system installed so that it can be opened from both sides.

Ben Smith has begun work on the port engine and continues the project of cleaning and painting.

The Air conditioner raw water pumps pictured above should both be thoroughly cleaned and inspected. Test amperage draw and re-wire with proper cable and connector. missing cover plates replaced.

No comments:

Post a Comment