Monday, August 9, 2010

Aug 9, 2010

Frame for generator is secured in place with stainless lag bolts.
Plywood base is painted and ready to mount.
Generator room cleaned and cleared of all major debri, tools organized
Junction box for AC water pump installed and forward pump wired.
Ordered 2 new motors for raw water pumps. One will be used to replace the aft air conditioner
pump which is old and tire. The second pump will be kept as a spare. The motor frame is a 56j universal frame which can also be used for the water maker raw water pump.
lighting fixture will be replaced in engine room and i am currently working on the emergency lighting.
sonny will begin repair of the out side deck on the first rain free day. Most of the generator covers are already painted.
I continue to have problems with the salon Air conditioner. If it is the unit that has rusted out i will price one out and install it myself. I may need to rent equipment to evacuate and recharge system, which i am sure is available in the area.
Any word on a used laptop for the boat?
Pictures will follow later today.