Tuesday, August 3, 2010

Generator Room:
Yesterday, Chad began cutting aluminum and tack welding the frame at a shop he uses. he brought the frame back to the boat and confirmed that it would be good fit.

The frame will come in 4 pieces. 2 main support beams and 2 cross sections. It is being built out of 3/8 high strength aluminum channel. it will be very light weight and incredibly strong.

This morning Chad is back at the shop completing all the welds and support gussets.

Ben is in the engine room cleaning shipping and painting.

I will be removing old fuel lines. Re- wiring old electrical and removing the old support beam in the generator room.

Pictures will be available tonight.