This is the wood platform decking in the Generator room, directly below the forward, air conditioner raw water pump.
This is a can of worms better suited for another time.
The pump, pictured below, has been inspected, cleaned and the motor just changed.
Aft pump motor will get the same treatment.
A new pump will be ordered (cheaper and with free shipping, I love that part) as well as a spare
A proper valving system should be used. Every pump should have a cut-off valve. This can be a future project.
Air conditioner pump after some TLC.
This is what a cared for pump should look like.
The beautiful aesthetics is a by-product. The main objective is to easily identify any failure in the form of a leak.
The pumps could use new mounting brackets and motor mounts
No comments:
Post a Comment